Optimal spares availability strategy for power transformer components

dc.contributor.authorMijailovic, Vladica
dc.date.accessioned2021-04-20T14:52:08Z
dc.date.available2021-04-20T14:52:08Z
dc.date.issued2010
dc.description.abstractThe paper suggests a method to optimize the spare amount of power transformer components. The proposed strategy is conceived to provide minimum annual cost consisting of expected failures renewal cost, capital cost for spares and load curtailment cost. The method identifies minor and major failures. Minor failures are repairable, while major failures can be repairable or unrepairable. Power transformer is a complex system, consisting of six components (functional parts). It is assumed that each component has two independent, competing failure modes: wear-out failure mode, modelled by two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution. The application of the method suggested and the benefits it provides are demonstrated for one transformer station (TS) 110/x kV/kV with 2×31.5MVA transformers. In addition, the influence of performing power transformer refurbishment on expected total cost has also been analyzed. © 2010 Elsevier B.V. All rights reserved.
dc.identifier.doi10.1016/j.epsr.2010.01.002
dc.identifier.issn0378-7796
dc.identifier.scopus2-s2.0-81055125967
dc.identifier.urihttps://scidar.kg.ac.rs/handle/123456789/10100
dc.rightsrestrictedAccess
dc.sourceElectric Power Systems Research
dc.titleOptimal spares availability strategy for power transformer components
dc.typeother

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
PaperMissing.pdf
Size:
29.86 KB
Format:
Adobe Portable Document Format